Scheme guide/Malaysia

Green Technology Financing Scheme: understand GTFS 5.0

The Green Technology Financing Scheme (GTFS) links green-project assessment with financing through participating financial institutions. Its published GTFS 5.0 summary describes guarantee support for financing the green component of a project.

If you're considering the scheme, start by understanding how that support would fit your bank financing. We'll explain the published basics and help you prepare the questions to ask about your company, project and application route.

For businesses & finance teams5 min read
A team installs solar panels on a large roof.
Illustrative solar installation team.
In this guide ↓
Application information & its limits

Status checked: 5 October 2026. The official portal advertises GTFS 5.0 applications as open. This is published application information. Remaining funds, acceptance for your applicant category and processing by a particular bank have not been established. Confirm those points before relying on GTFS in your funding plan.

What the published 5.0 summary says

Scroll sideways to read the table ↔

ItemPublished GTFS 5.0 information
Programme allocationUp to RM1 billion across the scheme
Stated programme periodUntil 31 December 2026
SectorsEnergy, manufacturing, transport, building, waste and water
Guarantee support60–80% of the financed green-component cost through participating financial institutions
Interest or profit rebatesNo rebates under GTFS 5.0

These details come from the official GTFS 5.0 FAQ.

The RM1 billion figure covers the scheme as a whole. For your proposal, ask which applicant category applies, which project costs count as the green component and what financing limit and guarantee coverage you could qualify for.

Understand how the guarantee fits your financing

Look at the guarantee alongside the proposed bank facility. Ask the financier to explain the amount, fees, security and repayments, how the guarantee operates and what your business remains responsible for.

The 60–80% figure describes guarantee coverage of financed green-component costs. It does not mean that percentage of your debt is waived. Read the financing and guarantee documents to establish your actual obligations.

Check both your company and your project

Make your first enquiry specific by describing both your company and your project:

Your company: its ownership, business activity and role in the project, so the administrator can identify the relevant applicant category.

Your project: the technology, sector, proposed costs and information supporting its environmental benefits.

The portal's general ownership FAQ describes Malaysian-registered companies with at least 60% Malaysian ownership and several applicant categories. That FAQ is undated and general, so ask how the condition applies to your category under GTFS 5.0.

Include a short technical description. It gives the administrator more to work with than a sector name alone and helps you establish the criteria your project must meet.

A factory worker measures sheet metal at an industrial machine.
Illustrative manufacturing investment and project delivery.

Get clear on the assessment stages

The GTFS process FAQ describes a sequence involving project certification, a financial institution's financing assessment and guarantee processing.

Use it to organise your enquiry:

  1. Confirm the current application route. Ask the scheme administrator for the 5.0 documents, applicant category and submission method.
  2. Prepare the project for certification assessment. Ask which technical information and supporting documents are needed.
  3. Discuss financing with a participating institution. Ask what it needs to assess your business's ability to repay and support the application.
  4. Clarify the guarantee stage. Ask the financier who handles it and which conditions must be met.
  5. Plan for commitments after financing. Establish which records, monitoring and reports the approved arrangement requires.

Portal pages describe different submission methods, so the current workflow and participating banks need confirmation. These stages help you structure the conversation; obtain the administrator's current instructions before submitting.

Prepare for your first conversation

You can start with a short project brief and the records you already have:

  • A short description of the project and its location.
  • The proposed technology, supplier and scope of work.
  • A cost breakdown and available quotations.
  • An explanation of the expected environmental improvement.
  • Your company and ownership information.
  • Available business financial records and a repayment plan.
  • Questions about permits, technical checks and the records you will maintain.

This is a suggested preparation list. Ask for the official current checklist before submitting or paying a processing fee.

Colleagues review printed documents during a meeting.
Illustrative financing and project-planning discussion.

Ask these questions before committing

Scroll sideways to read the table ↔

TopicQuestion to ask the administrator or financier
AvailabilityAre new applications being accepted for this category, and is allocation available?
VersionWhich GTFS 5.0 guideline and form should I use?
EligibilityDoes my company structure and project meet the applicable criteria?
ExpenditureWhich items qualify as green-component costs?
FinancingWhat amount, period and contribution would apply to my proposal?
GuaranteeWhich coverage band applies, and what does it cover?
CostsWhat certification, processing, guarantee and bank fees apply, and when are they payable?
SubmissionWhich submission channel and supporting documents are required?
Bank participationWhich participating institutions are handling this category now?
Timing and reportingWhat deadlines, milestones and ongoing records apply?

If you have an older guide or a reference to rate rebates, confirm which version it covers. The portal also has GTFS 4.0 material, while the published 5.0 summary states there are no interest or profit rebates.

Leave your first enquiry with three things clear

Before preparing a full application, aim to establish:

  1. Whether applications are being accepted for your category.
  2. Which 5.0 criteria and documents apply to your company and project.
  3. Which institution can discuss the financing and guarantee with you.

Start with the GTFS 5.0 FAQ and the portal's application information page. Confirm the version and process directly before submitting documents.

If you also plan to seek a tax incentive, check that route's own timing and conditions before committing expenditure. GTFS support and tax eligibility need separate assessment.

To prepare the wider financing conversation, read:

Follow the evidence

Original sources

Documents and publisher pages linked in this guide. Confirm current terms directly with the relevant organisation.

  1. GTFS 5.0 FAQgtfs.my
  2. general ownership FAQgtfs.my
  3. GTFS process FAQgtfs.my
  4. GTFS 4.0 materialgtfs.my
  5. application information pagegtfs.my
  6. advertises GTFS 5.0 applications as opengtfs.my